Status

Where things stand

Pre-prototype and capital-efficient by design.

What we've done

  • Established a working relationship with Ukrainian drone developers
  • Active relationships with Ukrainian field teams and front-line operators
  • Workshop and testing facility established in Kharkiv, Ukraine
  • Front-line partnerships in place for prototype testing
  • UGV core-component development and field testing underway
  • Initial advisory board assembled
  • Initial system architecture and operational planning complete
  • CCPC structure underway for SR&ED, IDEaS and BDC Defence eligibility

First 90 days post-close

  • Core engineering team in place
  • Technical strategy locked, first prototype path chosen
  • First IDEaS submission filed
  • First Ukraine field engagement within six months
  • Initial procurement and testing pathways identified
Milestone roadmap
M 0-3 · Foundation

Foundation

Core team hired. CCPC complete. First IDEaS submission. Prototype design locked.

M 3-9 · Development

Development

AI command stack, propulsion modifications, airframe development. Ukraine field testing of components.

M 12 · MVP

MVP

Integrated MVP on the upgraded platform. Controlled flight trials.

M 12-15+ · Validation

Validation

Battlefield validation in Ukraine within weeks of MVP. DRDC trials initiated.

M 18 · Series A Ready

Series A Ready

Battlefield-validated proof points. Series A positioning.